Monday, December 30, 2019

Fall Things

In our old house we had very few big trees and we did not have to rake very much, but in our new house we have a ton of big trees and a lot of leafs to rake up!  We also had to have the concrete replaced around our pool due to the cracks being too large and not fixable.  We had three companies come out and quote the job because we were hoping one of them would say that they could just patch the cracks, but they all said the same thing.  While we had that replaced, we figured we would have our front side walk replaced as well because it has settled over time.




 Before

It took them a lot longer to get the cement out than they planned because there was so much rebar in it.

After
After

 Right after we got all of the leaf's to the curb we got 5 1/2 inches of snow.  It was even before they could pick up the leaf's.






No comments:

Post a Comment